Case
steel warehous for industrial zone, steel frams worshop in Middle East,steel prefabricated design arch steel structure buildings. BR PREFAB export@fsprefab-house.com
Do you like ?0
Read more
The project was successfully completed in September 2015. During the half year construction period, all departments cooperated closely to complete the project with high quality as scheduled. Nothin...
Do you like ?0
Read moreLocation: Sudan
Project: Bus Terminal Station
Time: 12 Aug 2016
SQM: 5600 SQM
Requirements
This project is locate in the Sudan, it used as Terminal station
Considerated points for design
1...
Do you like ?0
Read moreThe prefab homes for accommodation camp project is Located Yaounde, Cameroun. The local climate conditions are divided into rainy season and dry season. The amount of wet rainfall is sufficient in r...
Do you like ?0
Read moreLocation: Mozambica
Sets: 20,000 sets
Time: 2013
&nb
Do you like ?0
Read moreALC panel construction introduction
Time: 30 Dec 2020
Size: 30m*12m*4m
Requirements
1,Span life: Up to 50 years.
2,Highly reliable and wind resistance is 110kph.
3,Low cost, easy and fast to bui...
Do you like ?0
Read moremodular house suuplier, steel frames supplier in China, BR PREFAB efficent reply within 24 hours. email: export@fsprefab-house.com
Do you like ?0
Read morePrefabricated house project Location: Tanzania, Totally quantity is 200 sets, completed time is 2015
Do you like ?0
Read more















